Frontiers in Management Research
The Vernacular Architecture in the Process of Rapid Post-Disaster Reconstruction - A Case Study of Lixian County, Sichuan Province
Download PDF (1058.7 KB) PP. 118 - 125 Pub. Date: October 8, 2018
Author(s)
- Xianmin Mai1, Haiyan Zhong1, Jun Wen1, Kangcai Nie1, Shuang Zhou1, Xiao Luo2*
1School of Urban Planning and Architecture, Southwest Minzu University, , China
2Tongji University, PR China; Shanghai Tongji Urban Planning & Design Institute , PR China
Abstract
Keywords
References
[1] Yueqiao Yang, Ping Gao, Haijun Li (2017) Residents’ satisfaction to post-Wenchuan earthquake recovery and reconstruction. Nat Hazards (2017) 87:1847–1858
[2] Yong Tang (2016). Potentials of community-based tourism in transformation towards green economies after the 2008 Wenchuan earthquake in West China. Journal of Mountain Science 13(9):1688-1700
[3] Xiaolu Li, Nina Lam, Yi Qiang, et al. (2016) Measuring County Resilience After the 2008 Wenchuan Earthquake. Int J Disaster Risk Sci (7): 393–412
[4] Anastasia L-S, Nabil M, Kamel RK (2004) Residential recovery from the Northridge Earthquake: an evaluation of federal assistance programs. California policy research center university of California, California
[5] Barenstein JD (2006) Housing reconstruction in post-earthquake Gujarat: a comparative analysis. Humanitarian Practice Network, Overseas Development Institute, London
[6] Chen SH, Mei QG, Hu AG (2010) The change analysis of inhabitant demand in Wenchuan earthquake. Chin Rural Econ 3:73–86
[7] Chen SH, Mao M, Liu Z (2014) The empirical study on the post-disaster reconstruction capacity and its performance: county-level government in Wenchuan earthquake as an Example. China Popul Resour Environ 24(8):156–161
[8] Li GP, Peng SQ, Yang L (2013) Policy effect evaluation on post-Wenchuan earthquake recovery and reconstruction-based on the viewpoint of people afflicted by earthquake in Sichuan province. Soft Sci 27(08):132–135
[9] Lu Y, Xu J (2014) Comparative study on the key issues of post-earthquake recovery and reconstruction planning: lessons from the United States, Japan, Iran and China. Nat Hazards Rev 16(3):04014033
[10] Thomas T, Ott JS, Liese H (2011) Coproduction, participation and satisfaction with rehabilitation services following the 2001 earthquake in Gujarat, India. Int Soc Work 54(6):751–766
[11] Xu JP, Zhuo AN (2011) Meta-synthesis pattern of cooperation between NGO and local government in postdisaster reconstruction after the Wenchuan earthquake. J Catastrophol 26(4):127–133
[12] Yang YQ, Chi BM, Yan JX (2014b) Empirical study of post-earthquake reconstruction evaluation frame-the case of Lushan county. Earthquake 3(34):149–159